Skip to content

Explore all content

Explore the content of this site using the filters below to display different categories of information – Item Types, and their sub categories.
When you are looking for specific items of interest, use the search tools; enter keywords in the basic search on the landing page or in the header, or the Search page where you can enter keywords and define search parameters.
98 results found
Uncheck All / Check All
Download
Contact Us
Compare
Display as:
of 2
Skip to search block
Add or Restrict Keywords

Use these options to add or remove words from your search:

AND - the term must be included in any item returned.

OR - the term may be included in any item returned, but does not have to be present. Always relates to the previous keyword/s.
*Cannot follow after NOT.

NOT - the term must not be included in any item returned. Always refers only to this keyword.
*Cannot be followed by OR

To remove a keyword – click X.

To return to your original search terms – click Clear.

Update search
Clear
template is PDF
100 Willis Street, Majestic Centre, refurbishment of general lobby and Willis Street access
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Levels 21 and 22, internal fitout
template is PDF
88 Willis Street, Majestic Centre, Level 18, internal fitout
template is PDF
88 Willis Street, interior tenancy fit-out, new partitions, kitchen and security access
template is PDF
100 Willis Street, Majestic Centre, alteration to specified system
template is PDF
100 Willis Street, CONFIDENTIAL, Majestic Centre, level 9 and 10, internal fit out
template is PDF
88 Willis Street, CONFIDENTIAL, CANCELLED, Majestic Centre, Stage 4, extend retail shop 4 out to street frontage
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, levels 5-7, internal fit out
template is PDF
100 Willis Street, CONFIDENTIAL, Majestic Centre, level 8, fit out
template is PDF
100 Willis Street, CONFIDENTIAL, Majestic Centre, internal alterations to levels 9 and 10, modify three sprinkler heads for new room
template is PDF
100 Willis Street, CONFIDENTIAL, Majestic Centre, level 25, office fit out to existing tenancy space
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 35, level 23, reinstatement of floor layout to open plan following seismic works
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 33, Level 20, reinstatement of floor layout to open plan following seismic works
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 30, Level 11 reinstatement following completion of seismic works
template is PDF
100 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 53, Habit South exercise area fitout
template is PDF
100 Willis Street, CONFIDENTIAL, Majestic Centre, internal fit out, level 23
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, fit-out on level 5 and 6 (excluding stairs and core areas)
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, internal fit out to podium Level 1, meeting rooms and new break out space with kitchenette
template is PDF
88 Willis Street, Majestic Centre, CONFIDENTIAL, interior fit out works for level 8 and 10
template is PDF
88-100 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 22, Levels 5 and 6, on floor structural works
template is PDF
100 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 20, level 16 plant and Level 29 roof structural works
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 13, on-floor works for Level 9 slab strengthening including level 8 enabling with amendments
template is PDF
100 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 11, level 5 transfer beam enablement works 5-9
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 9, enabling works between Levels 5-28 to form penetrations within all floors to enable a new riser pathway
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 7, structural strengthening
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 5, strengthening of transfer beam to underside of level 5 between columns C8 and 3
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 28, enabling works to facilitate the structural strengthening of levels 5, 6 and 7
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 27, level 23, timber stair infill with amendment
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, construction of new accessible toilet /shower, Male and female changing rooms and Bike parking enclosure in the basement level B1
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 39, Level 7, office fit out including lift lobby alteration
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 42, Habit Corporate Office Stage 1a, 1b fit out, construction and fit out of shower/changing room and corporate office fit out on podium P1 level
template is PDF
88-100 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 50, Level 23, internal fitout
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 37, level 26, reinstate north-east portion of level as separate tenancy
template is PDF
100 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 6 Habit Gym male bathroom upgrade for seismic works
template is PDF
88-100 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 5, upgrade to spin room and female bathroom at Habit Gym
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 38, reinstatement of level 27 back to open plan office
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 45, seismic strengthening, Habit stage 3, temporary exercise rooms
template is PDF
100 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 43, Habit stage 4, fitting out of two new Physio rooms
template is PDF
88-100 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 8, habit ramps and stairs
template is PDF
88-100 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 34, reinstatement of level 24 deck following seismic strengthening
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 7, ground level, new verandah to street frontage
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 5, extend retail shop 5 out to street frontage
template is PDF
88-100 Willis Street, CONFIDENTIAL, Majestic Centre, relocation of existing telecommunications equipment from level 12 to level 16
template is PDF
88-100 Willis Street, CONFIDENTIAL, Majestic Centre, levels 1, 2 and 25, office fit-out
template is PDF
88-100 Willis Street, CONFIDENTIAL, Majestic Centre, demolition of existing tenancies on Level 25
template is PDF
88-100 Willis Street, CONFIDENTIAL, Majestic Centre, demolition and internal fit out to podium levels 1 and 2
template is PDF
88-100 Willis Street, CONFIDENTIAL, Majestic Centre, Levels 8 and 14, demolition work of existing tenancies to prepare for new fit out work
template is PDF
88-100 Willis Street, CONFIDENTIAL, Majestic Centre, Level 10 and 11, aterations to office fit out
template is PDF
88-100 Willis Street, CONFIDENTIAL, LAPSED, Majestic Centre, demolish tenancy fit out, put floor back to vacant space for re-leasing on levels 12 and 15
template is PDF
88 Willis Street, CONFIDENTIAL, Majestic Centre, Stage 2, replacement of roof and internal alterations to existing offices
of 2