Skip to content
23 results found
0 filters applied
Refine Search Terms
Uncheck All / Check All
download Download
Contact Us
Compare
Display as:
of 1
Skip to search block

Filter by

  • Titles Only
  • All Fields
  • All Fields + Content
DONE
Remove All Filters
Add or Restrict Keywords

Use these options to add or remove words from your search:

AND - the term must be included in any item returned.

OR - the term may be included in any item returned, but does not have to be present. Always relates to the previous keyword/s.
*Cannot follow after NOT.

NOT - the term must not be included in any item returned. Always refers only to this keyword.
*Cannot be followed by OR

To remove a keyword – click X.

To return to your original search terms – click Clear.

Update search
Clear
template is PDF
108 Lambton Quay, Greenock House - office building alterations - level 11
template is PDF
110 Lambton Quay - Commercial - Greenock House - Level 13 - Office fitout for Ministry of Justice. aka 39 The Terrace
template is PDF
110 Lambton Quay, Commercial: Internal fitout for an existing cafe, new counter, a new accessible toilet, one unisex toilet. New plumbing, electrical, lighting and flooring.
template is PDF
108 Lambton Quay, business additions and alterations level 13
template is PDF
108 Lambton Quay, Greenock House - additions and alterations - level 4
template is PDF
108 Lambton Quay, Greenock House - level 10 - new joinery and plumbing to kitchen area
template is PDF
108 Lambton Quay, additions and alterations to suites 1 and 2, level 4
template is PDF
108 Lambton Quay [102-112 Lambton Quay], Greenock House, level 3, internal office partitions to create new office
template is PDF
110 Lambton Quay, Greenock House - levels 10 and 11 - office fitout
template is PDF
108 Lambton Quay, office fit-out, level 2 and 3
template is PDF
110 Lambton Quay, install kitchenette, level 6
template is PDF
110 Lambton Quay, refurbishment of bathrooms, level 5 to level 13
template is PDF
110 Lambton Quay, Greenock House Ltd -Internal fitout to level 4
template is PDF
110 Lambton Quay, Proposed internal part office fit-out including minor alteration to existing sprinklers, HVAC to fit new tenancy including a new kitchenette to level 12. AKA 39 The Terrace.
template is PDF
110 Lambton Quay, Quick Consent - Greenock House, install accessible toilet, shower and basin on level 4, connecting to existing water and waste system
template is PDF
110 Lambton Quay, Greenock House - Level 3 - Office Fitout.
template is PDF
108 Lambton Quay [39 The Terrace], removal of partitions, levels 10 and 11
template is PDF
84a Rintoul Street, conversion from single dwelling to two
template is PDF
84b Rintoul Street, replacement of retaining wall
template is PDF
108 Lambton Quay, 39 The Terrace. Greenock House - Shop 5 - Level 1 - New fire rated partition between shop and lift foyer. New fire rated ceiling between levels 1 and 2.
template is PDF
108 Lambton Quay, addition of toilet blocks, levels 7 and 8
template is PDF
110 Lambton Quay, Greenock House - Work to include alterations to the accessible ramp, new counter and kitchen.
template is PDF
110 Lambton Quay [aka 39 The Terrace], Office fitout in level 2